Application - Warehousing and Storage
Temporary Buildings for Waste Management and Recycling Operations
Typical uses:
- Waste segregation
- Materials sorting
- Recycling storage
- Processing support
- Operational cover
Temporary buildings for waste management and recycling operations are used where covered, controlled space is required to support compliant handling and processing of materials. They provide practical environments for sorting, storing, and managing different waste streams as operational and regulatory requirements evolve.
Suitable for short-term or long-term use, these buildings support day-to-day recycling and waste management activities as waste streams and operational requirements change.



Get In Touch
Waste Management and Recycling Operations
Recycling and Waste Handling Design Considerations
Waste management and recycling facilities place specific demands on buildings: clear separation of different material streams, efficient movement of waste and recyclables through the site, and layouts that support safe, compliant operation. Buildings must accommodate plant, vehicles, and people working simultaneously, often in challenging environments.
Increasing requirements around waste segregation and materials recovery mean operators need additional covered space to separate, store, or process materials correctly. Building layouts must support this separation while maintaining safe access for vehicles, loaders, and materials handling equipment.
Our buildings for waste management and recycling operations are available in three building types, allowing the building to be matched precisely to how it will be used:
Canopy recycling buildings
Used where weather protection and open access are required. Open-sided canopies provide covered space for waste tipping, initial sorting, or materials handling while allowing free movement of vehicles and plant.
Non-insulated recycling buildings
Provide enclosed, secure space at ambient temperature. Suitable for segregated materials storage, sorting operations, and processing support where protection from the elements and containment of materials are required.
Insulated recycling buildings
Used where staff work inside the building for extended periods or where a more controlled internal environment is required. Suitable for specialist processing, manual sorting operations, or operational spaces within recycling facilities.
Selecting the right structure type at the outset ensures waste management operations remain effective as processing requirements and material volumes change.
The Benefits of Aluminium Framed Buildings
Our cost-effective aluminium framed buildings can be erected quickly in just a few days. Low transport and assembly costs help keep the overall cost of temporary buildings below comparable traditionally built permanent alternatives.
from 5m to 30m
snow loads
Temporary and permanent industrial building solutions
building length
Ground anchoring with and without foundations
Bespoke building sizes and equipment available on request
Wall heights
up to 8.3m
Building Design for Robust Recycling Operations
Recycling and waste management operations benefit from clear internal space that supports heavy-duty use and flexible layouts. Clear spans and unobstructed interiors allow processing equipment, storage zones, and internal vehicle movements to be arranged around operational workflows.
Access planning plays a key role in safe and efficient waste and recycling operations. A wide range of door and gate options can be incorporated to suit different waste streams, vehicle types, and handling processes. Separate personnel access can be provided to support safer movement on site, with protective barriers incorporated where required to manage interaction between vehicles, plant, and people.
These design considerations ensure the completed building supports safe, compliant recycling operations from day one, while accommodating changes in waste streams and processing requirements over time.
Need Advice?
If you’d like guidance on selecting the most appropriate building for your waste management or recycling operation, speak to our team. We’ll advise based on site layout, processing requirements, material flows, and how your operation may need to adapt over time.
Next Steps
We can provide an early-stage project report outlining a suitable structural approach and a ballpark cost range to support initial planning and internal decision-making.
This can then be followed by a free site visit. After the site visit, we produce a project-specific report based on confirmed requirements, site conditions, and intended use.
Want to know more?
If you’d like a deeper understanding of how we support projects beyond the structure itself, the links below explain our approach.
Testimonials
Read what our customers have to say
Contact us
We manufacture all of our aluminium framed structures in our production facility in Germany. With a highly qualified team of industry experts, we manage everything from planning, design, manufacturing, delivery to site and assembly of the finished industrial structures.